|
Home Status Timeline Team Design Information Proposal Preliminary Design Review Critical Design Review Flight Readiness Review Post-Launch Assessment Review Safety |
FRR Files: Flight Readiness Review (PDF) Addendum on Second Test Flight (PDF) Appendix A (PDF) FRR flysheet (Microsoft Excel) FRR presentation (Microsoft Powerpoint). For our Flight Readiness Review (FRR), we were required to fly our full-scale vehicle to prove is flightworthiness. We flew on March 3, 2010, and other than a recovery error, the flight was successful. We were able to collect valid data from the experiment package, and are in the process of analyzing it.
Lift-off weight: 20.2 lbs (9.175 kg)
A video of our first test flight:
Due to the recovery error, we were required to perform another flight. We flew again on March 27, 2010, and had a fully successful flight. We used it as a second control flight (without the spinning mass gyroscopes running), and again collected data.
Lift-off weight: 19.1 lbs (8.65 kg) A video of our second test flight:
|